Deck Permit in Savannah, GA (2026)
Everything you need to know about getting a deck permit in Savannah: fees, requirements, exemptions, and direct links to the Savannah Building Permits.
Quick Facts for Savannah
Permit Fees
$75,000+: $8.00 per $1,000 valuation. Minimum fee: $40 plus $5 technology fee.
Processing Time
Permit Specialist calls when review is complete.
Apply Online
Yes — via Savannah Permits
Building Code
2018 IRC and 2018 IBC with Georgia State amendments
Do You Need a Deck Permit in Savannah?
Permit Exemption
Decks not more than 30 inches above adjacent grade per Georgia-amended IRC R105.2.
If your deck does NOT meet all exemption criteria, you must obtain a permit before construction. Building without a required permit can result in fines, stop-work orders, and required demolition.
Savannah-Specific Deck Rules
How to Get a Deck Permit in Savannah
Check if your deck needs a permit
Review the exemption criteria above. If your deck exceeds any threshold, a permit is required.
Prepare your plans
You'll need a site plan, deck dimensions, framing details, and footing specifications. Check Savannah's specific documentation requirements.
Submit your application
Apply through Savannah Permits . Pay the permit fee at submission.
Build and schedule inspections
Once approved, post your permit visibly and schedule required inspections (typically footing, framing, and final).
Official Savannah Resources
Estimate Your Deck Cost
Get an instant cost estimate for your deck project in Savannah.
Deck Cost CalculatorSources
Data verified April 2026. Fees, processing times, and requirements are subject to change. Always confirm current information with Savannah's Savannah Building Permits.