Everything you need to know about getting a deck permit in Orlando: fees, requirements, exemptions, and direct links to the Orlando Permitting Services.
Permit Fees
Valuation-based (residential fee schedule dated May 22, 2023).
Processing Time
Simple residential: 2-5 business days. Decks may take longer.
Apply Online
Yes — via Orlando Permitting Services
Building Code
Florida Building Code, 8th Edition (2023)
Contact: 407-246-2271
Decks not more than 30 inches above grade and not exceeding 200 sq ft may be exempt. Exemption does NOT exempt from Florida Building Code compliance.
If your deck does NOT meet all exemption criteria, you must obtain a permit before construction. Building without a required permit can result in fines, stop-work orders, and required demolition.
Review the exemption criteria above. If your deck exceeds any threshold, a permit is required.
You'll need a site plan, deck dimensions, framing details, and footing specifications. Check Orlando's specific documentation requirements.
Apply through Orlando Permitting Services . Pay the permit fee at submission.
Once approved, post your permit visibly and schedule required inspections (typically footing, framing, and final).
Get an instant cost estimate for your deck project in Orlando.
Deck Cost CalculatorJoin homeowners who get free insights on project costs, permit changes, and money-saving tips. No spam — unsubscribe anytime.
Free forever. No credit card. Unsubscribe in one click.
Sources
Data verified April 2026. Fees, processing times, and requirements are subject to change. Always confirm current information with Orlando's Orlando Permitting Services.