Deck Permit in Boise, ID (2026)
Everything you need to know about getting a deck permit in Boise: fees, requirements, exemptions, and direct links to the Boise Planning and Development Services.
Quick Facts for Boise
Permit Fees
Valuation-based: $913.09 for first $100,000 plus $5.17 per additional $1,000. Plan review fee: 20% of building permit fee.
Processing Time
Minor work a few days, larger projects several weeks.
Apply Online
Yes — via Boise PDS Online
Building Code
2018 IRC (Parts I-IV and IX, with Appendix Q and S)
Contact: (208) 608-7070
Do You Need a Deck Permit in Boise?
Permit Exemption
Decks not more than 30 inches above grade and not serving a required egress door are exempt per IRC R105.2.
If your deck does NOT meet all exemption criteria, you must obtain a permit before construction. Building without a required permit can result in fines, stop-work orders, and required demolition.
Boise-Specific Deck Rules
How to Get a Deck Permit in Boise
Check if your deck needs a permit
Review the exemption criteria above. If your deck exceeds any threshold, a permit is required.
Prepare your plans
You'll need a site plan, deck dimensions, framing details, and footing specifications. Check Boise's specific documentation requirements.
Submit your application
Apply through Boise PDS Online . Pay the permit fee at submission.
Build and schedule inspections
Once approved, post your permit visibly and schedule required inspections (typically footing, framing, and final).
Official Boise Resources
Estimate Your Deck Cost
Get an instant cost estimate for your deck project in Boise.
Deck Cost CalculatorSources
Data verified April 2026. Fees, processing times, and requirements are subject to change. Always confirm current information with Boise's Boise Planning and Development Services.