Everything you need to know about getting a deck permit in Aurora: fees, requirements, exemptions, and direct links to the Aurora Building Division.
Permit Fees
Valuation-based. Use the online Permit Fee Calculator.
Processing Time
Contact Building Division for timelines.
Apply Online
Yes — via Aurora Building Division Online
Building Code
2021 IRC with Aurora amendments
Contact: 303-739-7420
Decks not exceeding 200 sq ft, not more than 30 inches above grade, not attached to dwelling, not serving exit door are exempt per 2021 IRC R105.2.
If your deck does NOT meet all exemption criteria, you must obtain a permit before construction. Building without a required permit can result in fines, stop-work orders, and required demolition.
Review the exemption criteria above. If your deck exceeds any threshold, a permit is required.
You'll need a site plan, deck dimensions, framing details, and footing specifications. Check Aurora's specific documentation requirements.
Apply through Aurora Building Division Online . Pay the permit fee at submission.
Once approved, post your permit visibly and schedule required inspections (typically footing, framing, and final).
Get an instant cost estimate for your deck project in Aurora.
Deck Cost CalculatorJoin homeowners who get free insights on project costs, permit changes, and money-saving tips. No spam — unsubscribe anytime.
Free forever. No credit card. Unsubscribe in one click.
Sources
Data verified April 2026. Fees, processing times, and requirements are subject to change. Always confirm current information with Aurora's Aurora Building Division.